Automatic Cosmetic Food Tubes Filling Ultrasonic Sealing Machine
  • Model: VK-TFS-009U
  • Sealing Dia: 5-50mm
  • Output power: 2.8kW
  • Voltage: AC220V/single phase 50/60HZ
  • Machine weight: 350kgs
  • After packaging: 380kgs
  • Machine size: 1100*1440*1660mm
  • Filling Range: A:6-60ml, B:10-120ml, C:25-250ml, D:250-500ml (Customer made available)
  • Control Style: PLC control
  • Time adjust: electronic adjust
  • Packaging: Plywooden case packaging
View Video

Plastic Tube Filling Machines is suitable for filling tubes made of plastic & laminated PP materials;

Machine Working Process

Auto Tube Loading → Auto Tube Orientation → Auto Filling → Auto Sealing → Auto Date printing → Auto trimming → Auto Tube Ejecting;

Features

  • Easy to operate and maintain.
  • Automatic positioning, filling, welding, cutting and trimming, printing code in one time.
  • Stainless steel machine body, strong and beautiful looks,
  • Sealing mould can be customized according to customer requirements. Can seal many size of tubes.
  • Ultrasonic Sealing Machine power source for the pneumatic, working steady, not easy to damage, customers can rest assured use.
  • Ultrasonic frequency can meet international standard, no harmful to human being or environment.
  • Can be work in time, not need wait the heat time.

Basic Parameter

side pictures for tubes filling sealing.jpg

ModelVK-TFS-009U
Sealing Dia5-50mm
Output power2.8kW
VoltageAC220V/single phase 50/60HZ
Machine weight350kgs
After packaging380kgs
Machine size1100*1440*1660mm
Filling RangeA:6-60ml, B:10-120ml,C:25-250ml,D:250-500ml (Customer made available)
Control StylePLC control
Time adjustelectronic adjust
PackagingPlywooden case packaging

Details

Drawing-1_for ultrasonic tubes filling sealing MC (2).jpg

Drawing-1_for ultrasonic tubes filling sealing MC (1).jpg

The filling system is for multipurpose in filling materials from lower viscosity like water to higher viscosity like honey.

Multipurpse filling machine.jpg

The filling nozzle functions as anti-dripping;

All the filling nozzles adapters include brass core &stainless steel spring and NBR O-ring & Ball;

anti-drop filling nozzles.jpg

Ultrasonic activated sensor for detecting the tubes before ultrasound cutting & sealing:

ultrasonic sensor.jpg

Ultrasonic sealing Mold

sealing mold cutter.jpg

PLC controlling panel is easy to operate with power switch,emergency stop button and Siren; The sudden stop for emergency use;

PLC panel.jpg

The disc consists of 10pcs of tubes holders which is specially designed with rubber ring and PP mold; Different diameter of tubes requires different set of tube holders;

PLC panel.jpg

Tube feeding system delivers the tubes in automatic way;

Feeding shot.jpg

Configuration & Spare Parts List

Components
Eye SensorMATSUSHITAJapan
Ultrasonic TransducerAmriaChina
ControllingOmronJapan
PLCDeltaTaiwan
MotorNamwanChina
Main MotorGear HeadTaiwan
CylinderAirTacTaiwan
SelenoidJaurlingChina
RelayOmronJapan
Inductive SwitchAirTacTaiwan

 

Model :Spare partsPic
1Ultrasonic Power boardFrom Iphone 112
2eletric eyesDSC_1580_副本
3Ultrasonic transducer8M5Z~}HGU5P$VW}E(AZPQ
4electromagnetic valveFrom Iphone 116
5upper mould
6down mouldFrom Iphone 110
7Tube holderQQ图片20151106142625
8Motor/segregatorF6759A2E029A16F409B2CAA761A9B78D
9Relay
10Cylinder ACQ50*20-S-B34$U6][Z8VABYB]J{2__HJ4
11Cylinder MA20*100-S-CA
12Cylinder MA20*101-S-CA0PEO`0U]6K_6ARR0ZFDDC2K

After-Sales Service

Quotation: FOB (Shanghai) the below mentioned quotation based

Package: Each machine wrapped by PO film, then packed to standard wooden case.

Production Lead: 20 workdays after getting the down payment 30%, the other 70% payment collected before shipping

Guarantee: For all the machine, it claims 1 years for guarantee. (Excluded from the warranty are problems due to accidents, misuse, misapplication, storage damage, negligence, or modification to the equipment or its components. Also the easy broken spare part is not included in the guarantee)

Installation: After the machine arrive your factory, if you need, our technician will go to your place to install and test the machine and also training your worker to operating the machine (the time of train depend on you worker). The expenses (air ticket, food, hotel, the travelling fee on your country) should be on your account and you need paid for the technician usd150 per day. Also you can go to our factory to do training.

After Service: If you get the problem on the machine, our technician will go to your place to fixed the machine as soon as possible. The cost should be in your account (as above).